Wahiawa 1075’ Reservoir Repair
Project entailed site and structure improvements to an existing 2-million-gallon reservoir for the Honolulu Board of Water Supply. The existing exterior surface was wrapped in new cable and concrete to strengthen the entire tank. Surface was finished with new paint.